 THREE-STEP APPLICATION OF SEALFLEX MEMBRANE SYSTEM  

STEP 1

Our chemically treated fibermat is rolled onto the clean, smooth concrete surface which is to be sealed. The fibermat must be butted. Do not overlap.

 

STEP 2

The base laminate coat is applied with a roller. It penetrates the fibermat, creating a laminate bond.

The Base Coat requires 2 to 3 hours of drying time. Actual time may be more depending on the temperature, humidity and air movement at the job site. Therefore, daily production will vary according to the size and conditions of each job. Generally, in a large open area, two men can apply 2300 sq ft of fibermat and Base Coat in an 8-hour day.

STEP 3

The finish sealer is also applied with a roller. Drying time is approximately 2 hours, depending on conditions. For 2300 sq ft, the Finish Coat will take approximately 2 hours for two men to apply. Finish Coat drying time is approximately 2 hours, again, depending on the conditions at the job site. If you can have outside air flow over Sealflex 2000 Membrane System, it will dry faster.

 

Only SEALFLEX certified installers can install the SEALFLEX 2000

Membrane System. Please contact us for certification information.